Its main function is to fix the rails on the sleepers or spring base plates, and it can withstand the vertical, lateral and longitudinal forces from the rails.


| Product Name | Track joint clamp | Washer type | Track joint clamp |
| Material | Carbon Steel | exterior finishes | Carbon Steel |
| Color | silver | Size | custom made |
| MOQ | 2000M/Each size | country of origin | China |
| Payment | T/T. other | Packing | As customer required |
The fishplate has a simple structural design, which can reduce the impact of the wheels on the rail joints, increase the continuity of the longitudinal deformation of the rails at the joints, and thus improve the smoothness of the train when passing. In addition, the fishplate is used in conjunction with the fishbolt, and the installation process is simple and quick, which is more labor-saving than the rail welding technology.
Fishplates can be divided into many types according to their materials and uses, including light rail fishplates, heavy rail fishplates and lifting rail fishplates. Among them, light rail fishplates, also known as track plywood, are often used in lighter track systems; heavy rail fishplates are used for heavier track systems, such as heavy-load railway transportation; and lifting rail fishplates are mainly used for lifting rails.
In addition, there are insulating fishplates, which are all made of high-strength composite materials. They have the advantages of corrosion resistance, rust resistance, UV resistance, non-conductivity, and non-magnetic conductivity, and are suitable for track environments that require special protection.
As an important part of railway tracks, fishplates play a key role in ensuring safe train operation and improving track performance. Their design and application are constantly optimized to adapt to different types of track requirements and improve overall transportation efficiency.
|
Q: What's your MOQ? A: If we have the products in stock, it will be no MOQ. If we need to produce, we can discuss the MOQ according to customer's exact situation. |
|
Q: How long is your delivery time?A: The general delivery time is 30-45 days after receiving your order confirmation. Anther, if we have the goods in stock, it will only take 1-2 days. |
|
Q: What is your term of payment? A: 30% down payment before producing and 70% balance payment before shipping. |






























